12:10 p.m. Activity Update from the Office of Conservation

They say they stopped berm work due to wet conditions. Good… ’cause it’s shaking away today!

DNR put out yesterday’s Inspection Report

And another update from them about a meeting Thursday . . .

APPJ_blog

Assumption Parish Police Jury

Bayou Corne/Grand Bayou Response Activity

Wednesday, Aug. 14 work-

Sinkhole Activity Code 1 – lowest level, indicating little seismic activity detected near sinkhole/Oxy 3

– Installing additional pressure monitor at 1469 Sauce Piquante

– Conducting ambient and in-stack air monitoring at 116, 135, and 1469 Sauce Piquante

– Installing 2-inch exhaust piping on ventilation systems at 1433 Sauce Piquante

 

ORW/CPT Wells

– – Removing water on ORWs 1 and 22 (north of La. 70, west of Texas Brine facility),  13 (Oxy 10 well pad), 32 (south of La. 70, west of Texas Brine facility),and 40  and 41 (north containment berm)

– Installing CPT 112W (north of La. 70, west of Texas Brine Facility)

 

Containment Berm/Roads/Sinkhole

– No work on containment berms due to wet conditions

– Continuing sinkhole survey

– Conducting preliminary as-built survey of containment berm

– Performing subsidence survey of Texas Brine facility and settlement plate…

View original post 5 more words

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s