Code 2 Continues – Parish Blog

Maybe it should be 3 or 4!
Lots of seismic activity continues …

next

Assumption Parish Police Jury

Bayou Corne/Grand Bayou Response Activity

Monday, August 4 work-

Sinkhole Activity Code 2 – indicating work is not allowed on sinkhole and within containment berms. Seismic monitoring indicates increased levels of subsurface activity near sinkhole/Oxy 3.

Air Monitoring/Sub-slab Sampling and Ventilation

– Conducting ventilation system inspections

ORW/CPT Wells

– Continuing pumping on ORWs 4 (northwest of containment berm), 14 (Oxy 9 well pad), 15 (north of La 70, east of Gumbo Street), 48 (north of containment berm), 54 (west of Bayou Corne, south of La 70), 57 (southeast of Oxy 9 well pad)

– Managing water produced from passive vent wells in bayou

– Monitoring flow rate and water production from passive vent wells

Containment/ Roads/ Sinkhole/Survey

– Conducting daily berm inspections

View original post

Advertisements

4 thoughts on “Code 2 Continues – Parish Blog

  1. This is LA-12 recorder last night for Aug 4, 2014 at 17:24 and 22:40 (CDT) Central Daylight Time.
    There was subsurface activity near sinkhole I say some of the road went deep six.

  2. Code 2 is the “secret word” for SUBSIDENCE! Or..in laymans terms, run like hell away from that sinkhole. Who was the Roman who ‘fiddled’ while Rome burned? Nero? Or was that Texas Brine?

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s